$299/month. Monthly only.
Report Draft
Build the report from approved findings, then generate buyer and realtor outputs from the same inspection record.
WooCommerce checkout. AI drafts help with the writing. The inspector approves every final report.
Report Draft Generation
Build the draft only after approvals
Hidden or internal photos stay out. Rejected findings stay out. Inspector approval is still required before delivery.
Inspection Details
123 Demo Main St, Austin, TX
Major Concerns
- Moisture staining and an elevated reading were noted at attic sheathing near the vent stack. Recommend evaluation and repairs as needed.
- Temperature-pressure relief valve discharge piping was incomplete at the water heater. Recommend qualified plumber correction.
- Flashing at the roof-to-wall transition was patched and appears vulnerable to leakage. Recommend qualified roofer repair.
- Roof flashing detail.
All Approved Findings
- Crawlspace - Access / visibility: Crawlspace documentation was limited because the available photo set was blurry. Additional photo documentation may be needed.
- Attic - Moisture evidence: Moisture staining and an elevated reading were noted at attic sheathing near the vent stack. Recommend evaluation and repairs as needed.
- Water heater - Water Heater: Temperature-pressure relief valve discharge piping was incomplete at the water heater. Recommend qualified plumber correction.
- Roof - Flashing: Flashing at the roof-to-wall transition was patched and appears vulnerable to leakage. Recommend qualified roofer repair.
- Electrical - Equipment label: Electrical panel labeling.
- Roof - Shingle Surface: Roof flashing detail.
Visible Photos
12 report-visible photos ready.
- Temperature-pressure relief valve discharge piping was incomplete at the water heater. Recommend qualified plumber correction.
- Temperature-pressure relief valve discharge piping was incomplete at the water heater. Recommend qualified plumber correction.
- Access and photo quality limited documentation of the crawlspace at the time of inspection.
- Moisture patterns are indicators only and should be correlated with field observations.
- Inspector approval required before final report release.
- Final roofing language requires inspector approval.
- Demo AI draft. Final language requires inspector approval.
- Demo AI draft. Final language requires inspector approval.
How the workflow works
See the connected flow in plain English before you change anything in the business.
How to use this workflow
Simple instructions keep the next step obvious for inspectors, office staff, and buyers.